Construction of a new generation hospital Bory

Construction of a new generation hospital Bory

The first hospital of the new generation of the World of Health network is currently growing in Bratislava’s Bory district.

It will include 14 operating rooms, a new generation emergency room, eight maternity rooms instead of boxes, a robotic medication preparation room, healthcare organized in multidisciplinary programs, innovative processes and modern radiodiagnostic equipment, a single standard for the patient or healing environment.

The rough construction of the hospital is currently completed. For its construction, the company Kranimex provided Liebherr tower cranes 2 x 112EC-H, 1 x 130EC-B, 1 x 185HC.

Photos from already completed construction :

Construction of the BORY HOME III residential area

A modern residential area Bory Home III is currently growing next to the new generation hospital. KRANIMEX used 7 Liebherr tower cranes for its construction.

An interesting combination of different types of tower cranes was created on the construction site – fast erecting cranes type K ,   flat top EC-B type cranes EC-B  , classic cranes type EC-H and also previous generation type EC  .

Configurations of mounted cranes :

Crane type
71EC-B5
71EC-B5
71EC-B5
71 K
71 EC
71 K
112 EC-H
Height under the hook (m)
30,3
39,8
39,8
27,9
40
27,9
40
Boom length (m)
32,5
37,5
35
37
39,2
37
45
Base(m)
3,8 x 3,8
3,8 x 3,8
3,8 x 3,8
4,5 x 4,7
3,8 x 3,8
4,5 x 4,7
4,6 x 4,6
Tower system
63LC
63LC
63LC
 K
71EC
K
120HC

 

Photos from the ongoing construction :